• Loading bays 3, 4 and 5 on the S floor at the front of site.
  • VT CCTV camera and Telephoto Lens providing enhanced safety.
  • Cross Corridor on S Floor showing Chamfered Corners for ease of movement.
  • Generous Corridor widths for easy access G Floor Corridor 2.
  • Trolleys, Sack Barrows and Pallet Trucks on S Floor for customer use.
  • Large Yard area and Loading bays 3, 4 and 5 on S Floor.
  • Internal Loading bay Area on F Floor Showing Trolleys, Sack Barrows and Pallet Trucks for Customer's Convenience.
  • Internal Loading Area on F Floor Showing Roller Doors for better temperature regulation on F Floor.
  • External view of yard and bays 1-5 on the S floor for easy access.
  • S Floor Corridor 1 fire protection and generous corridor widths.
  • S Floor Corridor 3 clean, dry and well lit.
  • S Floor Corridor 4 showing large doors and wider corridors.
  • S Floor corridor 7 all steel construction for better protection.
  • Aerial view showing S Floor Loading bays with Artic turning circles.
  • Aerial View showing G and F floor Loading bays.
  • Aerial View from the High Road end.
  • Aerial View from the Brook end.
  • 4.5 Tons lift forklift available for palletized goods.
  • Shiny clean floors corridor 6 S Floor
  • Colour coded Floors for easy customer navigation
  • Showing width of building internally
  • Box on trolley cross corridor S Floor.
  • Overhead gantry showing clearance for Artic vehicles
  • Barrier Protection S Floor